HOW MUCH HV Zones
Dataset description:
Latest analysis tranche reference: T10A Overview We are looking to mitigate a range of constraints across multiple voltage levels on the network. As they involve different methods of...
Source: Flexibility – Forecasts
Data Dictionary
| Title | Type | Label | Description | Example |
|---|---|---|---|---|
| CMZ Code | text | nan | Unique Constraint Management Zone code |
CMZ_T10A_WM_0025 |
| Zone name | text | nan | Zone name |
Albrighton Primary |
| Scenario | text | nan | Load data set scenario |
Holistic Transition |
| Financial Year | numeric | Year captured in financial year, as an example a financial year of 2027 would represent a calendar month and year range of April 2026 to March 2027 inclusive. |
||
| Main flexibility product | text | nan | Main flexibility product |
Scheduled Availability, Operational Utilisation - Day Ahead |
| Peak capacity required [MW] | numeric | MW | Maximum capacity required in the zone throughout the year |
21.3 |
| Estimated availability energy [MWh] | numeric | MWh | Estimated availability MWh energy required in the year |
3907.74 |
| Estimated utilisation energy [MWh] | numeric | MWh | Estimated utilisation MWh energy required in the year |
153.23 |
| Availability ceiling price [£/MW/h] | numeric | £/MW/h | 48.2 | |
| Utilisation ceiling price [£/MWh] | numeric | £/MWh | Maximum price for utilisation |
2893.6 |