NGED Connections Reform Register
Dataset description:
The NGED Connection Reform Project Register contains details of all projects submitted by National Grid Electricity Distribution (NGED) as part of the CMP435 process. The register...
Source: NGED Connections Reform Register
Data Dictionary
| Title | Type | Label | Description | Example |
|---|---|---|---|---|
| Licence Area | text | DNO Licence Areas are widely used as an regional aggregation in which the GSPs are allocated. |
East Midlands | |
| GSP | text | GSPs are points of connection between the Transmission System and a Distribution System. |
BERKSWELL 132kV S STN | |
| Company Name | text | The name of the company registered for the connection ageement. |
Exagen Holly Lane Limited | |
| Site Name | text | The name of site for a connection. |
Solihull, CV8 1PT | |
| G2TWQ Status | text | The status of a connection for the Gate Two To Whole Queue process. |
CMP435 | |
| Technology | text | The Technology category as assigned by NESO. |
Solar | |
| Export Capacity (MW) | numeric | MW | The full export capacity of the specific site and technology. |
75.0 |
| Firm Connection Date | timestamp | The firm connection date for when a site can connect to the network at full capacity. |
28/06/2033 | |
| Non-Firm Connection Date | timestamp | A site with non-firm connection date will be able to connect to the network earlier on a limited capacity. |
28/03/2027 |