87 Datasets found

Filter Results
  • Common Information Model West Midlands

    Common Information Model (CIM) for 132kV, 66kV, 33kV, and 11kV in the West Midlands generated by the NGED Integrated Network Model (INM). For each Grid Supply Point (GSP) there...
  • Common Information Model South Wales

    Common Information Model (CIM) for 132kV, 66kV, 33kV, and 11kV in the South Wales generated by the NGED Integrated Network Model (INM). For each Grid Supply Point (GSP) there...
  • Common Information Model East Midlands

    Common Information Model (CIM) for 132kV , 66kV and 33kV in the East Midlands generated by the NGED Integrated Network Model (INM). For each Grid Supply Point (GSP) there...
  • Common Information Model South West

    Common Information Model (CIM) for 132kV, 66kV, 33kV, and 11kV in the South West generated by the NGED Integrated Network Model (INM). For each Grid Supply Point (GSP) there...
  • Generation Capacity Register

    The Generation capacity register lists generators that: Are connected to our network ("Connected") Have accepted offers to connect to our network ("Accepted-not-yet-Connected")...
  • Flexibility – Reports

    Overview This section of the Flexibility Group focuses on making available regularly produced reports containing procurement and dispatch data. Data The Procurement_Report.csv...
  • Network Capacity

    Data used to visualise the capacity for the connection headroom of demand and generation on to Bulk Supply Point and Primary substations, including key asset ratings and...
  • EV Capacity

    A list of the Distribution Substations, including the network referencing up to GSP and Local Authority, and a description of the available capacity for EV chargers to be...
  • Distribution Future Energy Scenarios

    The Distribution Future Energy Scenarios (DFES) outline the range of credible futures for the growth of the distribution network, and represents the first step in the National...
  • West Midlands Primary Transformer Flows

    Import, Generation and Demand values at half hourly granularity per transformer for the previous two years from 31st March 2019.