60 Datasets found

Formats: CSV

Filter Results
  • Aggregated Smart Meter Data - LV Feeder

    All DNOs are required by licence condition to comply with Ofgem’s Data Best Practice (DBP) Guidance. The DBP Guidance was updated by Ofgem on 7th August 2023, and the DBP...
  • Distribution Substations

    This dataset provides the distribution substations within NGED's four licence areas and their connection to the primary substation. A distribution substation is an electrical...
  • LCT Enquiries

    This dataset contains the number of enquiries for connection of low carbon technology to the National Grid Electricity Distribution network aggregated by primary substation, low...
  • LCT Connections

    This dataset contains the number of low carbon technology connections to the National Grid Electricity Distribution network aggregated by primary substation, low carbon...
  • Super Grid Transformer Flows – East Midlands

    Import, Generation, Demand and Voltage values at half hourly granularity per transformer from 31st March 2022 to 31st March 2023.
  • Super Grid Transformer Flows - South West

    Import, Generation, Demand and Voltage values at half hourly granularity per transformer from 31st March 2022 to 31st March 2023.
  • Super Grid Transformer Flows - South Wales

    Import, Generation, Demand and Voltage values at half hourly granularity per transformer from 31st March 2022 to 31st March 2023.
  • Super Grid Transformer Flows – West Midlands

    Import, Generation, Demand and Voltage values at half hourly granularity per transformer from 31st March 2022 to 31st March 2023.
  • Flexibility – Reports

    Overview This section of the Flexibility Group focuses on making available regularly produced reports containing procurement and dispatch data. Data The Procurement_Report.csv...
  • Flexibility – Requirements

    Latest analysis tranche reference: T9A Overview We are looking to mitigate a range of constraints across multiple voltage levels on the network. As they involve different...