HV - Long Term Trade Parameters
Dataset description:
Overview This dataset contains information on what we will look to put forward in our upcoming trades, with the aim to provide more visibility ahead of the actual trade opportunities. For...
Data Dictionary
Title | Type | Label | Description | Example |
---|---|---|---|---|
CMZ Code | text | nan | Unique Constraint Management Zone code |
CMZ_T2A_SWE_0002 |
CMZ Name | text | nan | Zone name |
Exeter City |
Trade Opportunity Name | text | nan | Trade opportunity name |
T9A - 2025/26 - Operational Utilisation 15min Instruction - Exeter City |
Trade Opening Date | timestamp | Trade opening date |
23/09/2024 | |
Trade Closing Date | timestamp | Trade closing date |
04/11/2024 | |
Licence Area | text | nan | Distribution Licence area |
South West |
Flexibility Product | text | nan | Type of flexibility product |
Operational Utilisation - 15min Instruction |
Required Service | text | Flexibility requirement description |
Demand turn down (DTD) / Generation turn up (GTU) | |
Maximum Connection Voltage | numeric | kV | The maximum voltage at which a connection occurs within a CMZ in kV. |
33 |
Availability Ceiling Price | numeric | £/MWh | Availability Ceiling Price per MWh |
64.9 |
Utilisation Ceiling Price | numeric | £/MWh | Utilisation Ceiling Price per MWh |
3896.3 |
Delivery Dates | text | Dates for delivery of service |
03/11/25, 10/11/25, 17/11/25, 24/11/25 | |
Delivery Start Time | text | Start time for delivery period |
00:00:00 | |
Delivery End Time | text | End time for delivery period |
08:00:00 | |
Minimum Volume Sought | numeric | kW | Minimum kW requirement for delivery period |
0 |
Maximum Volume Sought | numeric | kW | Maximum kW requirement for delivery period |
1000 |