Short Term Trade Parameters
Dataset description:
Overview This dataset contains information on what we will look to put forward in our upcoming trades, with the aim to provide more visibility ahead of the actual trade opportunities. For...
Data Dictionary
Title | Type | Label | Description | Example |
---|---|---|---|---|
CMZ Code | text | Unique Constraint Management Zone code |
CMZ_T8A_SWE_0038 | |
CMZ Name | text | Zone name |
Feeder Road to Bedminster and Bower Ashton circuit | |
Trade Opportunity Name | text | Name of trade opportunity |
W/C 02/12/2024 - Scheduled Availability Operational Utilisation Day Ahead Notice - Feeder Road to Bedminster and Bower Ashton circuit | |
Maximum Connection Voltage | numeric | kV | The maximum voltage at which a connection occurs within a CMZ. |
33 |
Trade Opening Date | text | Trade opening date/time |
21/11/2024 | |
Trade Closing Date | text | Trade closing date/time |
26/11/2024 | |
Licence Area | text | Distribution Licence area |
South West | |
Flexibility Product | text | Flexibility product |
Scheduled Availability Operational Utilisation Day Ahead Notice | |
Availability Ceiling Price | numeric | £/MWh | Availability Ceiling Price |
2.49 |
Utilisation Ceiling Price | numeric | £/MWh | Utilisation Ceiling Price |
149.43 |
Delivery Date | text | Date of delivery for service |
02/12/2024 | |
Delivery Start Time | text | Start time for delivery of service in GMT/BST |
07:00:00 | |
Delivery End Time | text | End time for delivery of service in GMT/BST |
07:30:00 | |
Minimum Trade Required Capacity | numeric | Minimum MW requirement for delivery period |
0 | |
Maximum Trade Required Capacity | numeric | Maximum MW requirement for delivery period |
0.491 |