HOW MUCH and WHEN LV Zones
Dataset description:
Latest analysis tranche reference: T9A Overview We are looking to mitigate a range of constraints across multiple voltage levels on the network. As they involve different methods of...
Source: Flexibility – Requirements
Data Dictionary
Title | Type | Label | Description | Example |
---|---|---|---|---|
CMZ Code | text | nan | Unique Constraint Management Zone code |
CMZ_LV_T7A_EM_925139 |
CMZ Name | text | nan | Zone name |
925139 Clover Drive |
Licence Area | text | nan | Distribution Licence area |
East Midlands |
Flexibility Product | text | nan | Type of flexibility product |
Scheduled Availability, Operational Utilisation - Day Ahead |
Service Type | text | nan | Flexibility requirement description |
Demand turn down would benefit this area. For more information visit www.flexiblepower.co.uk/national-grid-electricity-distribution |
Minimum kW | numeric | kW | Minimum kW value required in the zone |
5 |
Maximum kW | numeric | kW | Maximum kW value required in the zone |
7.5 |
Ceiling Price | numeric | £/kW/year | Maximum price |
317.31 |
Start Delivery Date | timestamp | nan | Start date for delivery of service |
25/09/2023 |
End Delivery Date | timestamp | nan | End date for delivery of service |
24/03/2024 |
Morning Delivery Period | text | nan | Start and end time for morning delivery period |
08:00 - 12:00 |
Evening Delivery Period | text | nan | Start and end time for evening delivery period |
16:00 - 20:00 |
Days Required | text | nan | Indication of which days of the week will require services |
Monday to Friday |