Procurement Report
Dataset description:
Overview This section of the Flexibility Group focuses on making available regularly produced reports containing procurement and dispatch data. Data The Procurement_Report.csv file...
Source: Flexibility – Reports
Data Dictionary
Title | Type | Label | Description | Example |
---|---|---|---|---|
Tender reference | text | nan | Unique reference of flexibility service tender; where multi-year tender occur, this is shown on multiple lines |
CMZ_T5A_EM_0023_T6A |
Product | text | nan | Main flexibility product |
Dynamic |
Licence area | text | nan | Distribution Licence area |
National Grid Electricity Distribution (East Midlands) Plc |
Service location (Grid Supply Point) | text | nan | Constrant Management Zone (CMZ) name |
Berkswell SGT |
Service Provider | text | nan | Name/identifier of the flexibility service provider |
Zenobe Energy Limited |
Constraint Type | text | nan | Pre-fault and post-fault constraint type for which a flexibility service was dispatched |
Pre-Fault, demand constraint - Outage Conditions |
Constraint Management Zone Name | text | nan | Unique Constraint Management Zone code |
CMZ_T5A_EM_0023 |
Maximum Connection Voltage | numeric | kV | The maximum voltage at which a connection occurs within a CMZ |
132 |
Main technology | text | nan | Main technology used against each tender reference against the G99 of the ECR |
Other |
Secondary Technology (where applicable) | text | nan | Main technology (where applicable) used against each tender reference against the G99 of the ECR |
nan |
Dispatchable / non-dispatchable | text | nan | Information about capability of providers to respond to instruction in real time |
Dispatchable |
Number of bids received | numeric | nan | Number of bids received for each tender reference |
1 |
Bid outcome | text | nan | Accepted / Rejected |
Accepted |
Flexible Unit reference | text | nan | Unique ID which links accepted bids to a specific Flexible Unit |
TDSB_T6A_000235 |
Committed contracts / non-committed contracts | text | nan | Level of commitment within contract to provide a certain agreed level of capacity for dispatch |
Non-firm |
Flexible Capacity (in MW) | numeric | MW | Capacity contracted |
5 |
Flexible Capacity (in MVAr) | numeric | MVAr | Capacity contracted |
0 |
Maximum Run Time (hh:mm) | text | nan | The maximum time in minutes for which the solution can continuously deliver its flexible capacity |
06:00 |
Response Time (hh:mm) | text | nan | The lead-time from the time of DSO instruction to full delivery of Flexible Capacity |
00:01 |
Connection voltage (in kV) | text | kV | Voltage at which a connection is made |
nan |
Delivery Year | numeric | nan | Regulatory year the delivery will take place in |
2022 |
Contract start | timestamp | nan | Date on which a contract is anticipated to start |
18/04/2022 |
Contract end | timestamp | nan | Date on which a contract is expected to end |
18/04/2026 |
Service days | text | nan | Days on which a flexibility service is expected to be available |
Friday, Monday, Saturday, Sunday, Thursday, Tuesday, Wednesday |
Service window 1 FROM (where applicable) | text | nan | The earliest time of service required within a year |
09:30 |
Service window 1 TO (where applicable) | text | nan | The latest time of service require within a year |
18:00 |
Service window 2 FROM (where applicable) | text | nan | Additional time window start |
nan |
Service window 2 TO (where applicable) | text | nan | Additional time window end |
nan |
Original availability fee bid (where applicable, in £/MW/hr) | text | £/MW/hr | The original availability fee the flexibility requirement was set at within the tender rounds, at which bidding would initiate |
63.9 |
Original utilisation fee bid (where applicable, in £/MWh) | text | £/MWh | The original utilisation fee the flexibility requirement was set at within the tender rounds, at which bidding would initiate |
90.1 |
Agreed availability fee (where applicable, in £/MW/hr) | text | £/MW/hr | The agreed availability fee the flexibility requirement has won the bid at within the tender rounds |
5 |
Agreed utilisation price (in £/MWh) | numeric | £/MWh | The agreed utilisation fee the flexibility requirement has won the bid at within the tender rounds |
300 |
Service fee (in £/MWh) | text | £/MWh | The agreed service fee the flexibility requirement has won the bid at within the tender rounds |
nan |
Notes | text | nan | Additional information as required |
nan |
Procurement year | text | nan | Reporting year within which dispatch occurred |
2022/23 |