82 Datasets found

Formats: PDF

Filter Results
  • Distribution Network Options Assessment (DNOA)

    The Distribution Network Options Assessment (DNOA) represents the optioneering phase of the investment planning process, which is the third and final step. More details on its...
  • East Midlands BSP Transformer Flows

    Import, Generation and Demand values at half hourly granularity per transformer from 31st March 2022 to 1st April 2023.
  • EV Capacity

    A list of the Distribution Substations, including the network referencing up to GSP and Local Authority, and a description of the available capacity for EV chargers to be...
  • West Midlands Primary Transformer Flows

    Import, Generation and Demand values at half hourly granularity per transformer for the previous two years from 31st March 2019.
  • South West Primary Transformer Flows

    Import, Generation and Demand values at half hourly granularity per transformer for the previous two years from 31st March 2019.
  • System Voltage Optimisation

    This dataset contains the results of a real-time, centralised voltage control system for 33kV and 11kV electricity distribution networks, called System Voltage Optimisation...
  • Network Development Plan (NDP)

    The Network Development Plan (NDP) represents the second step in the network investment planning process, which uses forecasts to analyse and identify future network...
  • Net Zero South Wales 2050

    The Net Zero South Wales 2050 innovation project was undertaken as a partnership between Regen, National Grid Electricity Distribution (NGED) and Wales and West Utilities (WWU)...
  • Historic Transformer Voltages

    Voltages at half-hourly granularity for all transformers at GSP, BSP & Primary level across South West, South Wales, East Midlands & West Midlands, between April 2019 -...
  • FlexDGrid Fault Level Monitor Data

    Make and Break fault level data from the 10 Fault Level Monitors installed as part of the FlexDGrid Low Carbon Networks Fund innovation project