88 Datasets found

Formats: PDF

Filter Results
  • Common Information Model South West

    Common Information Model (CIM) for 132kV, 66kV, 33kV, and 11kV in the South West generated by the NGED Integrated Network Model (INM). For each Grid Supply Point (GSP) there...
  • Network Capacity

    Data used to visualise the capacity for the connection headroom of demand and generation on to Bulk Supply Point and Primary substations, including key asset ratings and...
  • EV Capacity

    A list of the Distribution Substations, including the network referencing up to GSP and Local Authority, and a description of the available capacity for EV chargers to be...
  • West Midlands Primary Transformer Flows

    Import, Generation and Demand values at half hourly granularity per transformer for the previous two years from 31st March 2019.
  • South West Primary Transformer Flows

    Import, Generation and Demand values at half hourly granularity per transformer for the previous two years from 31st March 2019.
  • Transformer Data

    Electrical parameters of transformers for all licence areas.
  • System Voltage Optimisation

    This dataset contains the results of a real-time, centralised voltage control system for 33kV and 11kV electricity distribution networks, called System Voltage Optimisation...
  • Network Development Plan (NDP)

    The Network Development Plan (NDP) represents the second step in the network investment planning process, which uses forecasts to analyse and identify future network...
  • Spatial Datasets

    Since 2016, National Grid Electricity Distribution have developed an approach to geographically map areas of our network. These are defined an Electricity Supply Areas (ESA)....
  • South Wales Primary Transformer Flows

    Import, Generation and Demand values at half hourly granularity per transformer for the previous two years from 31st March 2019.