88 Datasets found

Formats: PDF

Filter Results
  • Flexibility – Reports

    Overview This section of the Flexibility Group focuses on making available regularly produced reports containing procurement and dispatch data. Data The Procurement_Report.csv...
  • Flexibility – Requirements

    Latest analysis tranche reference: T9A Overview We are looking to mitigate a range of constraints across multiple voltage levels on the network. As they involve different...
  • Distribution Network Options Assessment (DNOA)

    The Distribution Network Options Assessment (DNOA) represents the optioneering phase of the investment planning process, which is the third and final step. More details on its...
  • Distribution Future Energy Scenarios (DFES)

    The Distribution Future Energy Scenarios (DFES) outline the range of credible futures for the growth of the distribution network, and represents the first step in the National...
  • Flexibility – Archive

    Overview Data files that have been superseded and/or are no longer in active use. Data The datasets below are historical and have since been superseded. For the latest...
  • South West BSP Transformer Flows

    Import, Generation and Demand values at half hourly granularity per transformer for the previous two years from 31st March 2019
  • South Wales BSP Transformer Flows

    Import, Generation and Demand values at half hourly granularity per transformer for the previous two years from 31st March 2019.
  • West Midlands BSP Transformer Flows

    Import, Generation and Demand values at half hourly granularity per transformer for the previous two years from 31st March 2019
  • East Midlands BSP Transformer Flows

    Import, Generation and Demand values at half hourly granularity per transformer from 31st March 2022 to 1st April 2023.
  • 11kV Underground Cables

    11kV underground cables for all NGED areas supplied chunked at OS 20km Grid in zipped ESRI Shapefile (SHP) format. Important Safety Information The information contained in this...